Civil works for Callide A Power Station in Biloela.
The project commenced in September 2011 and the scope comprised the regrading and capping of 100,000m3 of Ash with topsoil and hydro-mulching, the construction of stormwater drains and access road pavements.
AE’s diverse plant and equipment combined with our experience and construction methodologies were able to overcome significant variable ground conditions. We completed our work ahead of schedule to the satisfaction of the Client.