AE Group continued their long association working with Leighton Contractors and were engaged to provide construction fleet and equipment for the South West Transit Corridor (Package B).
The corridor was built to allow for the future growth centre of Ripley and continue west to the Cunningham Highway. The corridor included a two lane road and a future dedicated public transport facility.
The project consisted of:
Following the excellent project progress of the South West Transport Corridor – Package B, Leighton Contractors again awarded the bulk earthworks contract for Package C to AE Group.
Works on this section included:
With the in-situ highly dispersive soils and drought conditions at the time meant air quality was a significant issue. This challenge was met by finding several local sources of non-potable water which was used for dust suppression and embankment construction. Early investigation and proving of cut material allowed the use of existing material as special embankment fill. The placement of a plant workshop facility on site minimised down-time of earthmoving plant.
Head Office
81 Distillery Road, Yatala QLD 4207
(07) 3807 0633 office@aegroup.com.au
Tenders / Suppliers
Contact the Estimating Department on:
(07) 3807 0633 tenders@aegroup.com.au
Central Queensland
881 Long Pocket Road, Moranbah QLD 4744
52 Gemini Street, Tieri QLD 4709
(07) 4986 1140
cq@aegroup.com.au